Sign In | Join Free | My qualitytoyschina.com
qualitytoyschina.com
Products
Search by Category
Home > Other Lights & Lighting Products >

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

Categories Used Crawler Crane
Brand Name: XCMG
Model Number: XLC220
Place of Origin: China
MOQ: One Crane
Price: Negotiable Price
Payment Terms: L/C,T/T
Supply Ability: Supply According to Customer Needs
Delivery Time: According to Order Confirmation
Packaging Details: Packing According to Customer Requirements
Jib Angle: 15,30°
Operation Weight: 48.6 t
Jib Length: 60 meters
Maximum Gradeability: 30%
Weight: 24.6 t
Max Lifting Height: 93/106.5m
Max Boom Length: 13m-52m
Fly Jib Length: 13-25 m
Engine Rated Power: 242 /2100 kw/rpm
Gradeability: 30%
Max Travel Speed: 1.2 km/h
Condition: Used, in good working condition
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

220T Crawler Crane Can Play A Key Role In Heavy Machinery Handling And Improve Production Efficiency

XLC220 Crawler Crane Technical Specifications


Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m


Typical working conditions


Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook


Operating radius(m)


Main boom length(m)

17

20

23

26

29

32

35

38

41

44

47

50

5

220.0












6

196.0

192.0

190.5

179.0









7

177.0

176.0

174.5

173.5

167.0

156.0

144.0






8

154.5

154.0

153.5

151.9

147.3

144.7

138.2

127.0

115.0

103.0



9

136.0

136.0

135.2

133.4

131.0

127.0

124.0

121.0

109.0

103.0

101.0


10

115.0

115.0

116.0

116.0

115.0

112.0

110.0

107.0

105.0

102.0

99.0

91.0

12

87.5

87.9

88.2

88.3

88.4

88.4

88.4

87.2

85.5

83.8

82.2

80.6

14

69.7

70.2

70.5

70.6

70.7

70.7

70.6

70.6

70.5

70.3

69.1

67.8

16

57.4

58.0

58.3

58.4

58.5

58.5

58.4

58.3

58.3

58.1

58.0

57.9

18


49.0

49.3

49.5

49.6

49.5

49.5

49.4

49.3

49.2

49.1

48.9

20



42.5

42.6

42.7

42.7

42.7

42.6

42.5

42.4

42.2

42.1

22




37.2

37.4

37.3

37.3

37.2

37.1

37.0

36.9

36.7

24




32.8

33.0

33.0

33.0

32.9

32.8

32.6

32.5

32.3

26





29.3

29.4

29.4

29.3

29.2

29.1

28.9

28.7

28






26.3

26.3

26.2

26.2

26.0

25.9

25.7

30







23.7

23.7

23.6

23.5

23.3

23.1

32







21.5

21.4

21.4

21.2

21.1

20.9

34








19.5

19.4

19.3

19.2

19.0

36









17.7

17.6

17.4

17.3

38










16.0

15.9

15.8

40










14.7

14.6

14.4

42











13.3

13.2

44












12.1

Magnification

18

18

16

14

13

12

11

10

9

9

8

8


Notes:

1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook

Operating radius(m)

Main boom length(m)

53

56

59

62

65

68

71*

74*

77*

80*

83*

10

85.4

81.5

78.5

68.5








12

79.4

77.9

76.4

66.5

65.5

62.6

60.2

55.0




14

67.0

65.8

64.6

63.5

62.3

60.5

58.5

53.5

48.8

44.6

40.8

16

57.6

56.6

55.7

54.7

53.8

53.0

52.0

51.3

47.4

43.3

39.7

18

49.1

48.9

48.7

47.8

47.0

46.4

45.5

44.9

44.1

42.1

38.5

20

42.2

42.1

41.9

41.7

41.5

41.0

40.2

39.8

39.0

38.5

37.4

22

36.8

36.7

36.5

36.3

36.1

36.0

35.8

35.4

34.8

34.3

33.7

24

32.5

32.3

32.1

31.9

31.7

31.7

31.4

31.4

31.2

30.8

30.2

26

28.9

28.7

28.5

28.3

28.1

28.0

27.8

27.8

27.5

27.4

27.2

28

25.9

25.7

25.5

25.3

25.1

25.0

24.7

24.7

24.5

24.4

24.1

30

23.3

23.1

22.9

22.7

22.5

22.4

22.2

22.1

21.9

21.8

21.5

32

21.1

20.9

20.7

20.5

20.3

20.2

19.9

19.9

19.7

19.6

19.3

34

19.1

19.0

18.8

18.6

18.4

18.3

18.0

18.0

17.7

17.6

17.4

36

17.4

17.3

17.1

16.9

16.7

16.6

16.3

16.3

16.0

15.9

15.7

38

15.9

15.8

15.6

15.4

15.1

15.0

14.8

14.8

14.5

14.4

14.2

40

14.6

14.4

14.2

14.0

13.8

13.7

13.4

13.4

13.2

13.0

12.8

42

13.4

13.2

13.0

12.8

12.6

12.5

12.2

12.2

12.0

11.8

11.6

44

12.3

12.1

11.9

11.7

11.5

11.4

11.1

11.1

10.9

10.7

10.5

46

11.2

11.1

10.9

10.7

10.5

10.4

10.1

10.1

9.9

9.8

9.5

48


10.2

10.0

9.8

9.6

9.5

9.2

9.2

9.0

8.8

8.6

50


9.3

9.2

9.0

8.8

8.7

8.4

8.4

8.1

8.0

7.8

52



8.4

8.2

8.0

7.9

7.6

7.6

7.4

7.3

7.0

54




7.5

7.3

7.2

6.9

6.9

6.7

6.6

6.3

56





6.6

6.5

6.3

6.3

6.0

5.9

5.7

58





6.0

5.9

5.7

5.7

5.4

5.3

5.1

60






5.3

5.1

5.1

4.9

4.7

4.5

62







4.6

4.6

4.3

4.2

4.0

64








4.1

3.8

3.7

3.5

66








3.6

3.4

3.3

3.0

68









2.9

2.8

2.6

70










2.4

2.2

Magnification

7

6

6

6

5

5

5

4

4

4

4


Notes:

1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


Cheap 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency for sale
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0