| Sign In | Join Free | My qualitytoyschina.com |
|
| Categories | Metal Precision Stamping |
|---|---|
| Brand Name: | No brand |
| Model Number: | TY-3 |
| Certification: | RoHS |
| Place of Origin: | China |
| MOQ: | 100pcs |
| Price: | $1 |
| Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Ability: | 100000pcs per month |
| Delivery Time: | 30 |
| Packaging Details: | Carton box |
| Material: | Galvanized Sheet |
| Product name: | Fan Blade |
| MOQ: | 100pcs |
| Package: | Carton Package |
| Color: | Silver |
| Keyword: | Draught fan |
| OEM: | Available |
| Logo: | Accept Customized Logo |
| Used for: | Ventilation/air exhaust |
| Angle: | 34 degree |
| Company Info. |
| Beijing Oriens Technology Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
aluminum stamping 200mm diameter draught fan blade



The fan blades are made of Aluminum 1060 or 3003 with custom angle, thickness and diameter. Durable material, anti-corrosion and anti-rust, making installation more easier and more convenient, saving time and labor cost.
Product Parameter
| Name | Aluminum fan blade |
| Model | AFB |
| Material | Aluminum 1060 or 3003 |
| Thickness | 0.7mm, 0.8mm, 0.9mm, 1.0mm, 1.2mm, 1.5mm |
| Angle | 15-34 degree |
| Diameter | 135,140,145,150,154,172,180,200,220,230,250,254,280,300mm |
| Production Technology | Stamping |
| OEM/ODM Service | Available |
| Application | Draught fan |
| Samples | Free |
| Function | Ventilation/air exhaust |



| Surface Treatment | Heat treatment, anodized, polishing, PVD/CVD coating, galvanized, electroplating, spraying, and painting |
|---|---|
| Material | carbon steel, stainless steel, aluminum, copper... |
| Type | Broaching, Drilling, Etching / Chemical Machining, etc. |
| Size | 1) According to customers' drawings 2) According to customers' samples |
| Process | Stamping/Punching |
| Certification | ISO9001 |
| MOQ | Low MOQ Start 1 Pcs (No need mold cost), Many Customers found us make prototype product to save Investment Funds for Pre-R&D and Market Testing. |
| Delivery Time | 1-25 days after order with prepayment based on products structure and quantity |
|